PINE VALLEY PROJECT

TECHNICAL DETAILS OF PINE VALLEY PROJECT
APARTMENTS

Structure:
All the structural building frames will be Seismic Reinforced Concrete.

The Walls:
The building walls will be made of Clay Bricks.

Wall Finishes:

  • External walls will be covered with 3 coats of plaster and 3 coats of high quality acrylic paint.
  • Internal walls will be covered with 3 coats of plaster and 3 coats of high quality plastic paint.
  • Bathroom walls. W/C walls and the space between upper and lower kitchen cupboards will be covered with high quality ceramic wall tiles.

Floor Finishes:

  • Entrance, Entrance hall, Kitchen, Living room and all the Corridor floors will be covered with ceramic tiles.
  • Outside terrrace, Staircase and balconies will be covered with high quality Natural Travertine Marble.
  • Bathroom and W/C floors will be covered with high quality ceramic floor tiles.
  • Bedroom floors will be covered with high quality laminated Parquet.

Doors & Windows:

  • Entrance door will be made of high quality massive timber.
  • All outside doors and windows will be double glazed Aluminium.
  • Internal doors will be pressed type (American Press).

Pergolas:
Pergolas will be made of high quality massive timber.

Wardrobes:
Spacious bedroom wardrobes will be made of laminated wood with plenty of drawers and hanger space.

Kitchen:
All the kitchen cupboards will be made of laminated wood and work tops will have special heavy duty laminated covers. Stainless steel sink units will have double bowls. Fridge, Hob & Oven, cooker hood unit and a Dishwasher will be provided as standard kitchen appliances.

Sanitary Fittings:
High quality bathroom, W/C units and accessories will be used.(white in colour)

Mechanical Works:

  • All the units will have an independent AC unit in each room installed as a standard.
  • Each unit will have a 1 ton reserve water tank as well as electrical and solar heating units installed on the roof. In addition, there will be a central water storage tanks in the garden providing additional water supply to all the units.
  • High quality PVC pipes will be used internally, external water supply will be high quality galvanized steel pipes.

Sewage System:
Exclusive general waste water treatment system will be used.

Electrical Installation:

  • Adequate number of lights, power points, telephone and TV points will be provided.
  • A communal power generator will automatically provide electricity to all the units when there is a power cut.

Isolation:
All the roofs will be covered with 3mm thick polyester waterproofing material and 2 cm thick hot & cold isolation boards.

Landscape works:
The landscaping will be done professionally as a standard.

Exclusive Communal Amenities:

  • Two separate overflow swimming pool will be provided for communal use.
  • A high spec Sauna ,Gymnasium will serve the residents.
  • Cafe Bar and Kindergarden will be provided .
  • Multipurpose sport area which includes (Tennis, Basketball, Volleyball fields)

DOTS

TECHNICAL DETAILS OF PINE VALLEY PROJECT
VILLAS

Structure:
All the building frames of the villa’s will be Seismic Reinforced Concrete.

The Walls:
The building walls of the villa’s will be weather proof isolated walls giving protection against hot & cold weather. Clay Bricks will be used on internal and external walls.

Wall Finishes:

  • External walls: 3 coats of plaster and 3 coats of high quality silicone paint.
  • Internal walls: 3 coats of plaster and 3 coats high quality plastic paint.
  • Bathroom & W/C: High quality wall tiles will be used.
  • Kitchen: Between the upper and lower units high quality ceramic will be used.

Floor Finishes:
Outside terraces, entrance – entrance hall, kitchen, lounge, staircases, corridors and the 1st floor balconies will be natural travertine marble. All the bedrooms will be high quality laminated parquet. Bathroom and W/C in bedrooms will be covered with high quality ceramic tiles.

Doors & Windows:
Front door will be made of high quality heavy timber. Internal doors will be pressed type. All outside windows and doors will be double glazed Aluminium.

Pergolas:
Pergolas will be high quality heavy timber.

Wardrobes:
Spacious bedroom wardrobes will be made of laminated wood with plenty of drawers and hanger space.

Kitchen:
All the kitcen cupboards will be made of laminated wood and work tops will have special heavy duty laminated covers. Stainless steel sink units will have double bowls. Fridge, Hob & Oven, cooker hood unit and a Dishwasher will be provided as standard kitchen appliances.

Sanitary fittings:
All sanitary accessories and fittings will be of highest quality (white in colour).

Mechanical works:
Central heating piping and AC units for each room will be provided as standard and in addition to this  6 ton water tank, boiler and solar collectors will be used.
High quality PVC pipes will be used for hot & cold water supply internally, external water supply will be high quality galvanized steel pipes.
Permanent fresh running water will be availabile in the garden.

Sewage System:
General waste water treatment system will be used.

Electrical Installation:
More than adequate number of power points, lights, telephone and TV points will be in place. throughout the house.
In the event of a power cut, a standby communal generator will be automatically in effect.

Isolation:
All the terrace roofs will be covered with 3mm polyester isolation plus 2cm isolation board as standard. This will give high quality isolation against  hot and cold weather conditions.

Chimney:
As standard all of the houses will have a chimney in the living room.

Landscape works:
As standard all of the houses will have special pavement drive way and the garden will be top soiled and lawned.

Swimming Pool:
The size of the pools will be 5m x 10m, the depth will be 1.4 standard, overflow system will be in effect and the surroundings of the pool (2.5m) will be paved by decorative marble.